At Evomech, we treat every project with meticulous attention to detail, transforming a standard approach into a commitment to excellence. We merge unyielding technical precision—ensuring every component meets the highest standards of accuracy and durability—with a deep dedication to client care and trust. Our detailed scrutiny guarantees both the superior quality of the final product and the seamless reliability of the entire execution process.
Our project management framework
Project Initiation
Develop a detailed project plan that outlines scope, timeline, budget, resources, and risk strategies. Execute the plan effectively, ensuring all project needs are met without compromising on quality or objectives.
Planning and Execution
Develop a detailed project plan that outlines scope, timeline, budget, resources, and risk strategies. Execute the plan effectively, ensuring all project needs are met without compromising on quality or objectives.
Monitoring and Control
Continuously track project progress to ensure alignment with the defined scope, schedule, cost, and quality standards. Promptly address any deviations or issues to keep the project on track and within constraints.
Project Closure
Verify that all project objectives and deliverables have been completed and formally accepted by the client or stakeholders. Finalize documentation, release resources, and conduct a post-project review to capture lessons learned.
Project Directory
1. Exhaust System Installation Work – Al Wafi Food Products Factory (BRF), KEZAD, Abu Dhabi, UAE
Supply, fabrication, installation, testing and commissioning of the Stainless Steel (SS304L) exhaust system for Fryer, Cookstar and Pro Mix Nitrogen Exhaust. The exhaust system is made of SS304L and PU Foam Injection Insulation is installed for nitrogen exhaust The system will be installed at Al Wafi Food Products factory (BRF), KEZAD, Abu Dhabi.
2. Installation of Chilled Water Piping – Mr. C Residences Downtown, Dubai – ALTA Real Estate Development, Dubai, UAE / Greenergy
Fabrication and Installation of chilled water pipeline including valve packages, FCUs, AHUs and Valve Chambers
3. Electrical Installation Works – Etihad Rail Passenger Station, Fujairah – Etihad Rail/ Electro RAK Group
Fabrication and Installation of cable tray, and GI conduits at Etihad Rail Passenger Station, Fujairah. This includes cable trays ranging from 50 mm to 800 mm and conduits of size 25 and 40 mm.
4. Electrical Works for the Container Skid – Ecoregen, Jabel Ali Industrial Area, Dubai, UAE
Supply and installation of field wiring of container skid. This includes the cable tray fabrication and installation, cable pulling, glanding and termination of Power, control and instrumentation cable.
5. Replacement of Exhaust Duct – Al Dhafra Paper Mill, Al Dhafra, Abu Dhbai
Replacement of GI exhaust duct of diameter 1.2 m.
6. Equipment Erection
Erection of Storage tanks, Reactors and Dissolvers. The scope includes offloading of containers, material handling, erection (tandem lifting) of tanks, and reactors, and installation of dissolvers.
7. Fabrication and Installation of Process Piping – Keil Anlagenbau GmbH & Co. KG
Fabrication and installation of process piping (CS).
8. Supply and Fabrication of Blowdown Vessel – Aspen Industries
Supply and fabrication of 1500L Blowdown Vessel for the boilers.